Customization: | Available |
---|---|
After-sales Service: | Site Installation 24hour Online Techinial Support |
Warranty: | 1year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
roller milling Machine Specifications | ||||
Type | 2235 | 2240 | 2250 | 2260 |
Capacity(T/D) | 100-200kg/h | 200-300kg/h | 300-400kg/h | 400-500kg/h |
Power(KW) | 17.5 | 18 | 18.5 | 19 |
Installation | 3*3*3.5 | 4*5*5.5 | 5*5*5.5 | 6*5*5.5 |
Pre-Sale |
Win-win cooperation: 1. Sign the contract 2. Establish mutual benefit, strategic cooperative partnership. |
|
In-Sale |
Design evaluation: Design of process and equipment layout Installation: 1. Quality and quantity guaranteed 2. Completion of hand over Acceptance: Acceptance test |
Technical training:
1.On-site installation and products training
2.Operation skills training
3.Maintenance training
4.Centralized technical training.
|
After-ale |
Engineers available to service machinery overseas Technical service: Long time technical service Master device: Free supply during warranty period. Accessories supplying: Supplying spare parts with cost. |
1. where are you?
We are based in Henan, China, start from 2016,sell to Africa(60.00%),Mid East(10.00%),Domestic Market(10.00%),South
America(10.00%),South Asia(5.00%),North America(1.00%). There are total about 51-100 people in our office.
2. how can you guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;
3.which type of machines can you supply?
Corn/Maize Milling Machine,Rice Milling Equipment,Wheat Flour Milling Machine,Oil Processing Equipment,Quinoa Processing Equipment
4. why should we buy from you not from other suppliers?
Henan Yubei machine is located in Huaxian, is a large grain and oil machine manufacturer include developing ,designing, making,installing which have more than 20 years experience. Our products are sole around the world.
5. what services can you provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW;
Accepted Payment Currency: USD,CNY;
Accepted Payment Type: T/T,L/C,Credit Card,PayPal,Western Union,Cash;
Language Spoken:English,Chinese
6: How about your delivery time?
Generally, it will take 10 to 15 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
7: Do you test all your goods before delivery?
Yes, we have 100% test before delivery.
2) Provide the standard device and the flow chart
3) According to the client's special requirement,offering the reasonable plan and free design helping to select the equipment
4)Welcome to visit our factory or the domestic clients' factory
2) Provide the spare parts at preferential price for an extended long time
3)Provide technical exchanging